National Gallery

Future-ready AV and digital infrastructure for a world-class cultural venue

The National
Gallery

CLIENT

Public venue, performance, community space

INDUSTRY

Specialist stage lighting and sound systems

SCOPE

The Venue

Refurbishing the Sainsbury Wing Lecture Theatre.

As part of the NG200 project, the National Gallery refurbished the Sainsbury Wing Lecture Theatre to create a flexible, technology-enabled venue capable of supporting a wide range of events. The space hosts lectures, panel discussions, film screenings, concerts, and broadcast filming, requiring a robust and adaptable technical environment within the constraints of a historically significant building.

The challenge & objectives

The existing AV and IT infrastructure was more than 25 years old and built around legacy analogue technologies.

Much of the cabling and equipment had reached end of life and could not support modern high-resolution or high-bandwidth formats.

The National Gallery needed a system that would deliver immediate performance improvements while also preparing the venue for future technologies, including higher-resolution video formats. The project also required careful coordination to ensure new infrastructure could be installed sensitively within a listed building environment.

Solutions delivered

Vanti delivered a complete redesign and upgrade of the lecture theatre’s AV and digital infrastructure, creating a scalable, IP-based platform for both audio and video.

Project delivery

The project was delivered as a Contractor’s Design Portion, with Vanti responsible for detailed design, installation, integration, and commissioning of the AV and IT systems.

Works included the full strip-out of redundant infrastructure, installation of new fibre, Cat6A, and 12G SDI cabling, and integration of existing loudspeakers and projection equipment into the new system. Three repurposed AV racks were configured in the control booth, alongside new stage and amplifier rack installations. Close coordination with the electrical contractor ensured containment and power requirements were fully aligned.

Vanti also delivered system programming, testing, commissioning, and client training to ensure the National Gallery team could operate the venue confidently across a wide range of event types.

Results & impact

The Sainsbury Wing Lecture Theatre now benefits from a modern, flexible AV and digital infrastructure capable of supporting high-resolution production standards and evolving event requirements.

The venue is equipped to host lectures, screenings, performances, and broadcast filming with improved reliability, expanded connectivity, and a scalable backbone that supports future technological developments. The upgrade ensures the space can continue to serve the National Gallery’s diverse programme while maintaining the integrity of its historic setting.